Chapter 537: Alchemy Inheritance
After I arrived at the integrated service plant on April 3, I was in charge of various projects and the maintenance of the dosing system of the integrated service plant.
The comprehensive service plant originally only had simple roads, the rain was all muddy water, dusty on sunny days, first of all, it was necessary to design the road, supervise the construction, and reserve various pipelines under the road pavement in the construction, a month's time, a total of 12,000 square meters of pavement, 2,000 meters of water pipelines.
The maintenance of the dosing system has always been the most tedious and dangerous work in the maintenance work, and the drugs required for sewage treatment are strong acids and alkalis.
On the basis of the original work, since arriving at the comprehensive service factory, he has been involved in the technical transformation of the plant, including 12 technical transformations such as the transformation of the grid machine, the declaration of sodium hypochlorite technical transformation, and the transformation of the Fenton system.
Work on backfilling the drainage tank began in early June. Before the comprehensive service plant took over, the factory area has a total of 5 2000 square meters of large pits, which are the sewage discharged from the factory, because of environmental protection requirements, must be backfilled within the time required by the Environmental Protection Bureau, for three consecutive days, I eat and live in the factory, in the case of five drainage pools full of water, take measures to successfully complete the tasks arranged by the superior within the specified time.
Since engaging in maintenance work, daily overtime has become a habit, many times there is a problem in the operation of the factory at the time of off-duty, and the maintenance needs to be completed with the completion of the maintenance
In mid-October, he took over the heating maintenance work of 10,000 square meters in the comprehensive service plant area, and immediately took half a month to find and replace more than 1,000 meters of frozen and leaking heating pipelines in previous years, 50 steam drums, during which the excavation pipeline reached 500 meters, and 5 large leakage points were repaired to ensure the heating of the plant.
At the beginning of November, he was transferred to the management of the operation of the dredging water, and in the operation post, he will make persistent efforts and work hard to ...... R1152