Chapter 473: The Secret of the Artificial Lake Bottom

Surrounded by everyone, Wu Hao and the others wore white hard hats and walked in the busy construction site.

Because the construction period is relatively tight, in order to catch up with the schedule, the construction of the entire park is carried out in the form of multiple simultaneous construction.

So at this moment, the whole park is like a big construction site, with many skilled workers and engineering equipment shuttling through it, as if it is a huge machine in operation.

Wu Hao looked at the construction site full of reinforced concrete, as well as the bare loess on the ground, and couldn't help asking: "I remember that there should be some old trees in the park, what should these trees do now?" In addition, the current appearance of the park, can it be restored in the future? ”

When Dong Yiming heard this, he immediately smiled and said, "Don't worry, we have already taken measures to protect these trees.

For some that must be moved, ask a professional garden expert to transplant it. It was then moved to a temporary nursery site not far from here for planting, and when the project was completed, it was transplanted back.

For those that don't need to be moved, we wrap the trunks to ensure that they won't be harmed during construction.

As for the vegetation of the entire park, it is inevitable that there will be some damage due to the construction. However, before the construction, we have already removed 80 centimeters of topsoil from the surface and then piled up to preserve it.

After the construction is completed, the soil will also be covered in the green area of the park, so that the fertility of the soil can be preserved as much as possible and the ecological damage will be reduced. ”

Xiong Mingsheng on the side also said: "During the construction, we also pay great attention to the protection of the ecology. Special environmental protection control personnel have been set up to supervise and control the wastewater and waste materials in the construction process to ensure that this piece of land will not be polluted, nor will it pollute the adjacent Linghu Ecological Wetland Reserve.

We also try to pay attention to the trees left in the construction site that Mr. Dong just said, and will not lose them.

After all, these trees have been growing for decades and hundreds of years, and it would be a shame to be hurt like this. ”

Wu Hao smiled when he heard this, and then nodded at everyone and said, "This place is close to the Linghu Ecological Reserve, and ecological environmental protection must be regarded as a top priority."

Now, with the increasing influence of Haoyu Technology, this project has attracted attention from all walks of life. The protection of the ecological environment is the most concerned by the people now, and if this project is contaminated with ecological and environmental problems, it will be a big storm.

Therefore, we must stick to this red line and never cross it. Even if it is to spend more money and delay some more construction periods, it is not at the expense of it. ”

"I understand that I will stick to this red line and will never allow any behavior to cross the line throughout the construction of the project." Dong Yiming nodded and replied seriously.

Wu Hao said about this matter, on the surface, it seems that he is a little on the line, but it is actually very serious. Especially now, the public's awareness of ecological environmental protection is constantly strengthened, so every time this kind of ecological and environmental incident breaks out, it is basically condemned by the whole people. Even if there is an excuse, once it is touched by the ecological environment, there is no chance to overturn the case.

And now Haoyu Technology and him have attracted much attention, if this kind of incident is involved, then they may really face a flash flood tsunami. It's not a good thing to overturn, but it's still very easy to pull off a layer of skin.

Again, there are already some problems with the land itself. It is close to the Linghu Ecological Reserve, and such large buildings are generally not allowed. It's good if no one pays attention to this matter, but once it is deliberately investigated, it can be a big thing.

Of course, there is no problem with the approval and formalities of this land, and all of them are compliant and legal. And there is a strict process for approving a large-scale project like this, so there will be no problems.

It's just that once you fail, these things and even some dispensable things will be poured on you, and it's useless to quibble.

Wu Hao nodded and said with a smile: "One of the big reasons why we chose our headquarters here was that we took a fancy to the good mountains and rivers here.

I don't want to destroy the ecology of this place because we moved here. ”

"Mr. Wu, you can rest assured, we will strictly abide by the construction standards during the construction process and reduce the damage to the ecological environment as much as possible." Xiong Mingsheng responded to Wu Hao.

Although Xiong Mingsheng said so, he didn't think much of Wu Hao's words. It's just that who makes the family the owner and the big boss, so you still have to follow the wishes of others.

Hearing Xiong Mingsheng's words, Wu Hao nodded slightly. In fact, he mentioned and emphasized this matter in front of so many people, on the one hand, it is to attach importance to the protection of the natural environment, and on the other hand, it is also to mention the need to take preventive shots.

In this way, even if there are problems in the construction process in the future, then with his words today, it can reduce some of the impact on them.

After turning a few more places, everyone immediately came to the core area of the Big Dipper in the middle of the entire park.

In addition to the foundations of the seven buildings, this is the huge artificial lake in front of them.

Don't look at it as just an artificial lake, in fact, this is also the most difficult in the entire foundation construction. First of all, it is necessary to dig such a lake out of the flat ground, which is a huge amount of work. And it's not just an artificial lake, it also doubles as a cooling pool.

So the bottom of the lake is not flat, but shallow on one side and deep on the other. In this way, the warm water in the shallow water will naturally flow into the cold water in the deep water in order to circulate the water.

Since the underground part of the seven buildings is close to the artificial lake, this waterproof and leakage prevention work must be done well. On the one hand, it is to reduce the erosion of the foundation by the lake water, which will affect the main body of the building.

In addition, there are other structures in the deep water area of the artificial lake. At the bottom of this artificial lake, there is also a secret facility. THE ENTIRE SECRET FACILITY IS LOCATED AT THE LOWEST LEVEL OF THE DEEP WATER ZONE, AND THE OUTER LAYER IS ENCASED IN 100CM CONCRETE. The interior is constructed of steel plates and alloys, creating an enclosed space that is isolated from the outside world.

This enclosed space is only accessible by two waterproof sealed doors, and once the lake water is injected, the enormous pressure will simply press down on the door. Basically, the outside world is very difficult to open unless there is a professional diver with professional large-scale engineering equipment.

The area of this enclosed space is not large, only sixty or seventy square meters. However, in the future, it will be installed in the intelligent AI core brain of the entire company campus, and the host terminal of his personal secretary 'Coco' will also be located here to control and be responsible for the operation of the entire campus.

It can be said that this place will be the core and most confidential existence of the entire company headquarters in the future.